Project Updates

Posted on: March 11, 2016

Replacement of the SR 53 Bridge (Bolling Bridge) over the Chestatee River

GH-063

Project Description: Replace the existing steel truss bridge that carries State Route 53/Dawsonville Highway over the Chestatee River/Lake Lanier. This two-lane structure has been determined to be structurally deficient and is eligible for federal bridge replacement funding. The proposed project would include the bridge approaches and would begin at a point approximately 0.42 mile southwest of the Chestatee River and extend to a point approximately 0.41 mile northeast of the Chestatee River, for a total project length of approximately 0.83 mile. The proposed new bridge would consist of two 12-foot travel lanes with 8-foot shoulders, and the roadway approaches would be reconstructed to provide two 12-foot travel lanes and 10-foot shoulders (2-foot paved).

Project Status: Construction in FY 2016.

$120 Million in Hall Road Projects Could Start in 2016

See full map
Facebook Twitter Google Plus Email

Other News in Project Updates

Atlanta Highway Widening

Atlanta Highway Widening

Posted on: March 11, 2016
I-85

I-985 New Interchange

Posted on: July 8, 2015
Spout Springs Road

Spout Springs Road Widening

Posted on: July 8, 2015
Sardis Road Connector

Sardis Road Connector

Posted on: July 8, 2015
Athens Highway

Athens Highway Widening

Posted on: July 8, 2015
I-85

I-85 Widening

Posted on: July 8, 2015