Past Planning Studies

Below is a list of all the past supplementary plans and planning studies that were conducted and sponsored by the Gainesville-Hall Metropolitan Planning Organization in our planning area:

Oakwood Citywide Traffic Improvement Study, 2018

This traffic study assessed current traffic condition on various roads and intersections throughout the City of Oakwood and recommended solutions to ease such congestion and facilitate better traffic movement. Below is the final report:

Oakwood Citywide Traffic Improvement Study

Gainesville-Hall Regional Freight Study, 2018

The primary purposes of the freight study were to:

  1. Assess the current freight infrastructure in Hall County and Jackson County
  2. Develop a plan based on latest federal, state, and regional policies
  3. Support the development of a future FAST Act compliant Regional Transportation Plan as it relates to any applicable freight provisions
  4. Address safety and connectivity based on the proposed new interchange, Exit 14, near State Route 13/Atlanta Highway
  5. Recommend areas for improvement, and
  6. Identify specific freight projects for the region

Gainesville-Hall Regional Freight Study

Green Street Corridor Study, Phase 2, 2017

The second phase of the Green Street Corridor Study identified potential alternatives to mitigate recurring congestion on Green Street and recommended specific solutions.

Green Street Corridor Study, Phase 2

Hall Area Transit Development Plan Update, 2017

The Transit Development Plan (TDP) Update yielded a four-year plan for public transportation within Hall County.  Through data analysis, driver interviews, public open houses, and peer reviews, the TDP yielded recommendations for service moving forward in a way that was beneficial to all within the Hall Area Transit service area.

Hall Area Transit Development Plan Update

Sidewalk Inventory Report, 2017

The Sidewalk Inventory Report highlights sidewalk availability throughout the GHMPO planning area and discusses potential opportunities to improve on that connectivity in the future.

Sidewalk Inventory Report

Mitchell Street Conceptual Study, 2017

The Mitchell Street Conceptual Study explored alternatives to improve the aesthetics and operations of the Mitchell Street corridor.  The study proposed three different concepts for consideration.

Mitchell Street Conceptual Study

Green Street Corridor Study, Phase 1, 2016

The purpose of Phase 1 of the study was to identify and gain a better understanding of the existing physical conditions within the Green Street corridor that might impact the feasibility of potential operational improvements to Green Street.  Of particular interest were subsurface conditions such as underground utilities, aging and/or substandard drainage systems or poor soil conditions.  Other factors such as the location of existing right-of-way, specimen trees along the corridor or potential historical assets (a potential factor depending on the available funding source used to make improvements to the corridor) were also key in developing a "constraints envelope" within which any future improvement must fit.

Green Street Corridor Study, Phase 1

GHMPO Bicycle and Pedestrian Plan Update, 2014

This partial update to the bicycle and pedestrian plan focused on expanding and enhancing multi-use trails to provide off-road facilities for bicyclists and pedestrians.

GHMPO Bicycle and Pedestrian Plan Update

City of Gainesville Transportation Master Plan, 2013

Following extensive analysis of transportation data and key input from the public, this plan came up with a list of transportation projects for the City of Gainesville to pursue through the year 2040.

City of Gainesville Transportation Master Plan

Park-n-Ride Surveys, 2012 & 2008

One of the recommendations from the Transit Development Plan was to have a commuter service in Year 5. As a starting point, surveys of the park-n-ride lots on I-985 was undertaken to understand current commuting patterns by Hall County residents to destinations outside the county and determine what the current level of demand is among commuters. Commuter and license plate surveys were conducted at the park-n-ride lots at Exit 4 and Exit 17 on I-985 in July, 2008 and a follow up survey in April 2012.

For more information, view the 2008 Park-n-Ride Survey (PDF) as well as the 2012 Park-n-Ride Survey (PDF).

City of Flowery Branch Downtown Transportation Study, 2010

This study identified a series of transportation improvements to address the vehicular and pedestrian needs of the City's historic downtown area. The contents of this document include an inventory of existing conditions, a needs assessment, project recommendations, and implementation strategies. 

City of Flowery Branch Downtown Transportation Study

GHMPO Human Services Transportation Plan, 2009

This plan served as the first step in the development of a coordinated plan for the Gainesville and Hall County areas.  It provided background information on the demographics of Hall County to identify target populations and documented existing transportation providers.  With this foundation, disconnections between groups were highlighted, gaps were exposed, and barriers to seamless implementation were uncovered.  The goal of this plan was to ensure all people, especially those with disability or low income, children, and the elderly had equitable access to appropriate transportation options by offering coordination strategies.

GHMPO Human Services Transportation Plan

Hall Area Transit Development Plan, 2008

The Transit Development Plan (TDP) served as a five-year action plan for public transportation in Hall County.  The TDP was designed to improve planning and delivery of the HAT services through analysis of existing transit conditions and by garnering feedback from the community.  Two public meetings, two outreach efforts, stakeholder interviews, and coordination with local jurisdictions were conducted to assess existing sentiments, suggesting improvements and identifying new services.  As a direct result of this process, two new routes as well as commuter bus service were recommended in this plan.

Hall Area Transit Development Plan

GHMPO Bicycle and Pedestrian Plan, 2006

The Bicycle and Pedestrian Plan addressed the goal of providing an integrated multimodal and intermodal transportation system by integrating bicycle and pedestrian facilities into the GHMPO's plans for state and federally funded transportation projects.  The plan identified proposed projects and design standards for new facilities, along with potential funding sources.

GHMPO Bicycle and Pedestrian Plan

Note:  The above list of documents does not include our main transportation plan-- the Regional Transportation Plan (RTP), also known as the Long-Range Transportation Plan (LRTP).  To see our present and past RTP/LRTP documents, please see the links below:

Gainesville-Hall Regional Transportation Plan: 2015 Update

Long-Range Transportation Plans Archive